The creek that runs across holes 5 and 6 has been receiving some needed attention. The creek has naturally begun to meander, and in doing so the water was backing up prior to going through the culverts at the three bridges. This was causing some significant erosion at the base of the bridges. We were able to dig out the stream bed and force it to come into the culverts on a more direct path. We then reinforced the base of the bridges with bags of concrete. This should increase their structural integrity and extend their life. In the process some of the staff members were able to collect about 350 golf balls!